Waterproofing
[PENDING CLIENT CONFIRMATION]
Testing Before Finishes
Rigorous 24 to 48-hour static ponding water leak testing verifying membrane integrity before tiling.
Overview
Professional Testing Before Finishes Works
Never leave water tightness to chance. Prior to tiling, we plug all drainage outlets, fill the waterproofed zone with water for 24 to 48 hours, and inspect lower floor ceilings to certify zero moisture penetration.
Scope of Work Included
✓
Secure mechanical plugging of all floor traps and drainage outlets
✓
Flooding test area to a controlled 25-50mm water depth
✓
24 to 48-hour static ponding observation
✓
Joint inspection of underside ceiling and perimeter walls for dampness
✓
Written test record sign-off before laying bed screed and tiles
Need a quote for Testing Before Finishes?
We provide itemised, transparent quotation schedules without obligation. Speak with our project specialists today.
Other Waterproofing Services
Curious how this fits into our complete workflow?
Explore our systematic 12-step renovation process from site inspection to meticulous handover.